| BattleGroup
Bastogne - Turn Review -
17DEC44-PM |

|
| |
17 DEC 44:
The US forces under increasing German pressure along the Clerf
River line
have begun to withdraw their Engineers of the 1128th Engineer
Group back to
help prepare the next defensive line. Meanwhile CCR, 9th US Armor
division
takes full responsibility for Wilwerwiltz (Zone 14) while remnants
of the
28th ID continue to contain the German bridgeheads at Drauffelt
(Zone 16)
and Clerveaux (Zone 12).
The German forces of course will continue to try to expand their
bridgeheads
at Clerveaux and Drauffelt. The 26th Volksgrenadier Division
did seize the
bridges at Kautenbach (Zone14) and was supposed to continue with
a two
pronged attack at Wilwerwiltz from the south and east. However,
the 559th
Jagdanzer Bn was delayed by congestion and could only move as
far as
Consthum (Zone 13). Without armor support of the 559th the commander
of the
77th Grenadiers held off an assault against CCR 9th AD and allowed
his weary
troops some rest.
For the afternoon of 17DEC44.
Scenario XI - City Fight in Clerveaux
Scenario XII - Panzer Lehr Bridgehead
Results:
The Germans held the bridgeheads at both Clerveaux (Zone 12)
and Drauffelt
(Zone 16).
The US forces stalled on heavy artillery barrges and difficult
terrain. The
110th forces were bled further. German losses were very light.
|